top of page

MORE PROJECTS

Oceanside Mesa Garrison Force Main, Oceanside Mesa Garrison Lift Station, Mission Ave Lift Station Force Main Replacement, and Land Outfall Replacement Progressive Design-Build Project

transparent_placeholder.png

Orion/TC Joint Venture has been awarded the Progressive Design-Build contract for the Oceanside Mesa garrison (OMG) Force Main, OMG Lift Station (OMG LS), Mission Avenue Lift Station (MALS) Force Main Replacement, and Land Outfall Replacement, with GHD serving as the design engineer. The Project includes installation of multiple parallel HDPE force mains ranging from 24-inch to 42-inch diameters, constructed primarily via open-cut methods with targeted trenchless segments to reduce environmental and community impacts. Upon completion, flows from the new OMGLS, Buccaneer Lift Station, and Buena Vista Lift Station will converge into the OMG Force Main and be conveyed to the San Luis Rey Water Reclamation Facility.

Villa La Jolla Storm Drain System Repairs

transparent_placeholder.png

A sudden pipe collapse during record rainfall created a sinkhole in the middle of Villa Jolla Drive threatening buildings, critical public infrastructure, and public safety. Orion mobilized immediately with the City of San Diego to implement emergency stabilization, shoring, and permanent storm drain replacement.

East County Advanced Water Purification (ECAWP) Program - Package 4, Santee, CA

transparent_placeholder.png

This project is package 4 of the East County Advanced Water Purification Project and delivers the brine-conveying and solids-dewatering liquid waste stream to the Point Loma Wastewater Treatment Plant. This integrates the regional solution to the management of brine and solids dewatering liquid-waste stream, increasing regulatory certainty and minimizing disruption to future East County AWP operations.

Catalina 12" Cast Iron Water Main and Catalina Sewer Main Improvement Project

transparent_placeholder.png

Orion and Harris & Associates partnered on an $18,525,277 design-build scope to remove and replace sewer and water mains and support fiber optic installation.

P-079 Potable Water Distribution Improvements at MCB Camp Pendleton

transparent_placeholder.png

Integrating modern valves, appurtenances, and operational tie-ins, this project helped ensure resilience, efficiency, and adaptability for current and future mission demands. This project not only improves water delivery and storage source water but also enhances the overall operational readiness and sustainability of Camp Pendleton’s critical water infrastructure.

Gilman Drive Storm Drain Emergency Replacement

transparent_placeholder.png

A sudden pipe collapse during record rainfall created a sinkhole threatening homes and critical public infrastructure. Orion mobilized immediately with the City of San Diego to implement emergency stabilization, shoring, and permanent storm drain replacement.

East County Advanced Water Purification (ECAWP) Program — Package 2, Santee, CA

transparent_placeholder.png

The project provides a local, sustainable water supply for up to 30% of the county’s population by recycling and purifying wastewater for surface water augmentation at Lake Jennings.

Design-Build P1046B Reclaimed Water Conveyance Pipelines at Camp Pendleton, CA

transparent_placeholder.png

The project introduced high-capacity reclaimed water pipelines, wells, and reservoirs serving both the northern and southern portions of the base. Early design coordination with federal and environmental agencies ensured long-term sustainability and regulatory compliance.

V-1 W Vista Way Sewer Phase 1 in Vista, CA

transparent_placeholder.png

Orion served as prime contractor on a $6,491,625 city project to upgrade the existing sewer system capacity via trunk main replacement.

Design-Build Catalina 24” Water and Sewer Main Replacement in San Diego, CA

transparent_placeholder.png

Orion and Harris & Associates partnered on an $18,525,277 design-build scope to remove and replace sewer and water mains and support fiber optic installation.

NSU Storm Drain at San Diego International Airport, CA

transparent_placeholder.png

Orion delivered a design-bid-build solution with 7,000 LF of storm drain piping and a dedicated pump station to mitigate airport stormwater issues.

Orion Logo.png
bottom of page