Repair Sewer Pump Stations Piers 1 & 2 nThis project required the refurbishment of sewage pump stations serving Piers 1 & 2 at Naval Base San Diego. The scope of work included demolition of existing pumps and electrical facilities, installation of a new...
Orion and its partners designed and constructed the Scripps Ranch Pump Station, which was honored as the Project of the Year by the American Public Works Association. The pump station consisted of a 2,400 square foot building with six pumps between 1,700 and 3,000 GPM...
This design-build project for Naval Base Point Loma was for the repair and upgrades of a potable water pump station, Pump Station 325. The scope of work included ventilation and roofing upgrades to the pump station’s existing building, replacement of the...
This project for the City of San Diego was for the repair and upgrades to Pump Station 64. This project involved repairs and modifications to the large diameter piping inside the pump station’s vaults as well as repairs to the vaults themselves. Before...
This project was for the improvement of a sewage pump station in Laguna Beach, CA. The pump station’s interior was re-designed, the pump house was expanded, the existing steel tanks were replaced with fiberglass tanks, and the pump station’s single pump was replaced...