Design-Build Revelstoke Emergency Storm Drain and Slope Repair – San Diego, CA

The City of San Diego called Orion to perform an emergency slope and storm drain repair. The storm drain failed and the slope eroded away leaving a 30ft deep canyon which threatened the nearby street, Revelstoke Way. Orion immediately mobilized its emergency crew and equipment and contacted its design partners. Orion utilized the design-build method to expedite design so construction could begin immediately. The repairs included over-excavation to remove unsuitable soil, backfill, installation a new RCP storm drain, and a cast-in-place dispersion structure.