Design-Build Water Group Job 926 – San Diego, CA

Design-Build Water Group Job 926 – San Diego, CA

This design-build project included the replacement of nearly 2.5 miles of potable water main and appurtenances in Point Loma, CA. Orion worked with the City of San Diego to determine early on where trenchless (CIPP) methods could be used to rehabilitate existing water...
Design-Build Sewer Group Job 743 – San Diego, Ca

Design-Build Sewer Group Job 743 – San Diego, Ca

This design-build project was for the repair and replacement of failing sewer main in San Diego, CA. Orion immediately engaged with the City and determined that 1,900 LF of sewer main were suitable for trenchless (CIPP) replacement. This reduced construction impact on...
Design-Build Overflow Reservoir – Camp Pendleton, CA

Design-Build Overflow Reservoir – Camp Pendleton, CA

This design-build project was for the repair and upgrades of Reservoir 1264 in Camp Pendleton, CA. The reservoir served as a major water source for the base’s headquarters area.  Orion replaced and re-directed the existing overflow and energy dissipater which were...