by Orion | Jun 4, 2019
Heavy Civil This design-build project for the Navy consisted of demolishing 8 1950s era concrete open-bay barracks at Camp Pendleton and grading the area to match the existing topography to prevent ponding and providing a flat training area for the Marines. Before...
by Orion | Jan 24, 2019
Orion was contacted by the Fairbanks Ranch Association to perform needed repairs to its existing gravity dam on a man-made lake. Years of sediment had built up in the lake rendering the lowest valves inoperable for the purpose of releasing water. Orion capped the...
by Orion | Jul 15, 2018
This design-build project involved the complete retrofit of the Brengle Terrace Park in Vista, CA. Orion designed and constructed new rip rap creek stabilization structures, light vehicle bridges, bio-retention basins, retaining walls and pedestrian trails. This...
by Orion | Jul 15, 2018
This design-build project was for the complete above and below ground retrofit of La Bonita Park in La Habra, CA. Orion constructed a 250,000 gallon underground water tank, a new potable water pump station, new park restroom facility, and new large diameter water...
by Orion | Jul 15, 2018
Heavy Civil This design-build project was to retrofit and improve nine areas of the City of San Diego’s stormwater system in preparation for an 85th percentile storm event. Retrofits included stormwater detention basins, bio-retention basins, vegetated swales,...