by Orion | Nov 12, 2019
Design-Build Park Village Storm Drain Repair – San Diego, CA This design-build project was designed and constructed on an emergency basis for the City of San Diego. After a major storm event, a sinkhole opened on Park Village Drive. Orion repaired the sinkhole...
by Orion | Nov 14, 2018
The City of San Diego contacted Orion to design and reconstruct two failed large trunk sewer manhole vaults that collapsed in front of Naval Base San Diego, with a pending large sewage spill into the Chollas Creek drainage way imminent. After the sewer vaults had...
by Orion | Nov 13, 2018
Portions of the Hale Avenue sewer had eroded over the years and, before the problem got any worse, the City of Escondido partnered with Orion to perform emergency repairs. The repairs were technically difficult because crews were working in high traffic areas and...
by Orion | Oct 26, 2018
The City of San Diego engaged Orion as a design-builder for this emergency waterfront repair at the picturesque Sunset Cliffs. Unstable portions of the cliffs threatened portions of the staircase leading to the water below. Orion, with its design partners, created a...
by Orion | Jul 14, 2018
The Burroughs Street storm drain failed during a major rain event, and the increased water flow created a sinkhole in the road that caused the drain and surrounding road to collapse. The City of San Diego tapped Orion as an emergency design-builder to effect a fix....
Recent Comments