Design-Build Overflow Reservoir – Camp Pendleton, CA

This design-build project was for the repair and upgrades of Reservoir 1264 in Camp Pendleton, CA. The reservoir served as a major water source for the base’s headquarters area.  Orion replaced and re-directed the existing overflow and energy dissipater which were threatening the nearby Rattlesnak Road. Orion also installed a solar mixer which was integrated into the base’s existing SCADA system.