Design-Build Demolish 8 Concrete Buildings for Flat Training Area

This design-build project for the Navy consisted of demolishing 8 1950s era concrete open-bay barracks at Camp Pendleton and grading the area to match the existing topography to prevent ponding and providing a flat training area for the Marines. Before demolition c OrionĀ  performed significant hazardous remediation before demolishing the structures. After demolition was complete, Orion graded the area, installed new sidewalks, and installed erosion control measures.