Design-Build Advanced Water Treatment Plant – Camp Pendleton, CA

Jul 14, 2018

Orion built a water treatment plant and designed and built all conveyances in Camp Pendleton. CH2M Hill designed the treatment plant and Orion constructed it. Orion designed and built the treatment plant’s conveyance system. This highly complex project required a multidisciplinary team to construct an operations building with chemical laboratory, two one-million-gallon bolted steel tanks, an underground sewer lift station, a chemical storage facility, a pump station, and installation of over 90,000 LF of HDPE pipe, requiring directional drilling under multiple rivers and a freeway.